Skip to content

What Documents Should a Coating Supplier Provide?

Key facts

Key facts: What Documents Should a Coating Supplier Provide?
DocumentWhenCheck that it includes
Technical data sheet (TDS)Before orderFilm range, cure, application, substrates
Safety data sheet (SDS)Before orderTransport classification, handling
Test reportsBefore orderStandard, substrate, film thickness, criterion
Batch QC reportWith goodsCoating batch, cure record, thickness, photos
Warranty certificateWith goodsPeriod, site category, exclusions

Before the order

The TDS tells you what the coating is designed to do; the SDS covers safety and transport. Test reports back the TDS figures — they should name the standard, the substrate, the film thickness and the failure criterion.

With the goods

The batch QC report is the record that the coating was applied as specified. It should identify the coating batch and mix, the cure temperature and time, film thickness readings with the method and location, and photos of key areas.

Warning signs

Salt spray hours with no standard named, a TDS with no cure conditions, or a batch report that is the same for every shipment.

What this means for your project

List the documents you need in the purchase order. PG data sheets, SDS and a sample batch report are available on the downloads page.

Technically reviewed byPelagard Technical TeamCoating selection, application and quality controlLast reviewed:
Request a quote

Tell us the equipment, the site and the destination port. We reply within 24 hours.

WhatsAppRequest a Quote