OEM Contract Coating for Coil Manufacturers

What we can process
How contract coating runs
New customers start with a first article: one or a few coils coated to the agreed specification and checked for film thickness, coverage and fin bridging. Once you sign off, production batches follow the same specification, and every batch is recorded — coating batch number and mix, cure temperature and time, film thickness readings and photos.
Waterborne and solvent-based systems are never run in the same dip tank, so the line is set up for the system on your specification before production starts.
Process
01Specify
Equipment, exposure, destination
02Sample
First-article coating for new systems
03Inspect
Incoming check with photo record
04Coat & cure
Dip, spray or flood; cure logged
05QC
Film thickness, coverage, fin bridging, adhesion
06Report & ship
Batch report travels with the goods
Coating options
Selected by site corrosivity. Salt-spray hours from different standards are not compared across systems.
| System | Film thickness | Cure | Best for |
|---|---|---|---|
| PG-S1 Waterborne polysiloxane (sol-gel) | 5–15 μm | Thermal or ambient | New coils before shipment, OEM dip lines |
| PG-S2 Polysiloxane-urethane clearcoat | 5–10 μm | 160 °C / 60 min | Aluminium radiators, bakeable heat exchangers |
| PG-W Waterborne two-component | 5–10 g/m² per side | 80 °C touch-dry | Coil lines, mild coastal and humid sites |
| PG-C Air-dry two-component, chemical-resistant | 20–40 μm | Ambient 72 h | Complete units, chemical and wastewater sites |
Related
- CoatingsWaterborne Polysiloxane (Sol-Gel) Coil Coating
- EquipmentCopper Tube, Aluminium Fin Coil Protection
- ComparisonsDip Coating vs Spray Coating
- GuidesWhat Is the Minimum Order for Contract Coating?
- CoatingsWaterborne Two-Component Coil Coatings
- EquipmentMicrochannel Coil Corrosion Protection
Also see
Can you coat to our own coating specification?
Yes. We coat to your film thickness, cure and QC requirements, or apply a coating your customer has specified.
Where do coated coils go after coating?
Back to your assembly line, or directly to your customer's loading port with the batch report.
Do you handle the transport between our factory and the coating line?
We can coordinate pickup and return within South China as part of the quote.
Tell us the equipment, the site and the destination port. We reply within 24 hours.
