Skip to content

What Coil Coating Do Gulf Region Projects Specify?

Key facts

Key facts: What Coil Coating Do Gulf Region Projects Specify?
Typical clauseHow to comply
Post-fabrication coating of the whole coilDip or spray after the coil is built, collars and joints included
Salt spray standard and hoursSubmit results to the named standard; do not substitute another
Approved brands or equalSubmit data sheets and test reports for approval as equal
SubmittalsTDS, test reports, application method, sample batch report
WarrantyCoating warranty certificate stating the site category

Read the specification first

Consultants in the Gulf usually write coil coating into the mechanical specification. Check which standard the salt spray requirement names, whether a film thickness is stated, whether brands are listed, and what must be submitted for approval.

Named brands

Where a brand is named “or equal”, an alternative is approved on evidence. Submit the data sheet, test reports to the same standard, and the application method. If a named brand must be applied by its own certified applicators, that is a project decision; we apply your specified coating system only where its manufacturer permits.

Submit before shipment

Approval after the equipment has arrived leaves no room to change the coating. Get the submittal approved before the order goes to the coating line.

What this means for your project

Send the coating clause of the specification with the enquiry. The reply states which requirements are met directly and which need a submittal.

Technically reviewed byPelagard Technical TeamCoating selection, application and quality controlLast reviewed:
Request a quote

Tell us the equipment, the site and the destination port. We reply within 24 hours.

WhatsAppRequest a Quote