Skip to content
Free tool

Coating Specification & RFQ Builder

Distance from the sea
Other exposure
Can the part be baked?
Your specification

A one-page specification you can attach to a tender or PO

  • · Coating system and dry film thickness
  • · Cure and application method
  • · QC checks and the records to receive
  • · Documents shipped with each batch
How this works

How the specification is built

The coating system and application method come from the same rules as the coating selector. Film thickness, cure and substrates are taken from the PG system data. QC checks and batch documents follow our 14-step coating process, where every step leaves a record.

Using it in a tender

Replace “PG-S1” (or the recommended system) with “PG-S1 or approved equal” if the tender must stay open to other suppliers, and keep the film thickness range, cure record and QC checks — those are what make coatings comparable.

Request a quote

Tell us the equipment, the site and the destination port. We reply within 24 hours.

WhatsAppRequest a Quote