Skip to content

What Is the Minimum Order for Contract Coating?

Key facts

Key facts: What Is the Minimum Order for Contract Coating?
RouteWhat drives the minimum order
Dip, PG system already in a tankLine slot and handling
Dip, system needing a tank changeTank fill and changeover
SpraySet-up and masking
Customer-specified coatingCompatibility review and trial part

What sets the minimum

A dip run needs the tank filled with the right coating at the right viscosity; switching systems costs time and material. Two-component coatings are mixed per shift and have a limited pot life, so very small quantities waste coating. A first article is needed for new customers and new systems.

Small batches

Spray has almost no set-up cost and suits small or one-off batches. Small dip batches can be scheduled alongside other orders using the same system.

What this means for your project

Give the full annual volume as well as the first order when you ask for a quote. Minimums and prices are confirmed per route in the quote.

Technically reviewed byPelagard Technical TeamCoating selection, application and quality controlLast reviewed:
Request a quote

Tell us the equipment, the site and the destination port. We reply within 24 hours.

WhatsAppRequest a Quote